...

Construction Progress

Follow the construction progress on the Vesica Villas Celuke development in Amed Bali. 

Work on the 9-villa complex began in September 2023. Preparing the land and infrastructure as part of Phase 1 Construction is well underway.

Below you can follow our progress through periodic blog posts dedicated to the project.

With all 9 Villas now sold, the project is ahead of schedule and will be complete by June 2026. 

Balinese building contractor carrying wood on Vesica Villas Celuke project in Amed
PROJECT COMPLETION JUNE 2026

Vesica Villas Celuke

3-bed/3-bath villas in amed

In August 2023, Vesica Property Developments secured a prime plot of land only minutes away from the town center of Amed.

Work on the development began immediately. The team has worked tirelessly with architects and contractors to develop what we believe to be an outstanding villa complex. 

Land in a prime location

When the architect brought his team for thier first assessment of the site, he literally said “this is a once in a lifetime plot and location.”

Utilizing the natural lay of the land, the development has been designed to capture stunning elevated views of the Bali Sea as the villas look down through the tropical hills of the Celuke Valley. 

Luxury villas built on 2-storeys

The management team had a clear vision of how to incorporate luxury living with the natural surroundings.

We used the land’s natural  elevation to provide stunning ocean views for each of the nine villas. Built on 2-storeys, we also made sure that privacy was a priority for residents.

The villas offer large landscaped gardens with spacious, modern interior design.

  • Average Plot Size: 465sqm
  • Interior Living Space: 380sqm
  • Outdoor Space: 125sqm 

Follow our Construction Progress

Vesica Villas Celuke

Building Villas in Amed – Phase I Construction Progress

Read More
Vesica Villas Celuke

Handing Over of Villa #8 – The Final Preparations

Read More
Vesica Villas Celuke

Villas #6 and #5 Retaining Walls Complete

Read More
Vesica Villas Celuke

5 Villas Sold – Phase II of Construction Underway

Read More
Vesica Villas Celuke

2-Storey Villas – 2nd Floor of Villas Complete

Read More
Vesica Villas Celuke

Villa walls and brick work

Read More
Vesica Villas Celuke

Foundations for Villas #7, #8 and #9

Read More
Vesica Villas Celuke

Drainage system and road networks

Read More
Vesica Villas Celuke

Retaining walls with stylish design

Read More
Vesica Villas Celuke

Electricity Power Supply – Energy for Construction

Read More
Vesica Villas Celuke

Artesian Water in Amed – Drilling For Water

Read More

Stages of Development

Land Acquisition & Right to Build
0%
Architecture & Concept
0%
Land preperation
0%
Vesica Villas Celuke concept overview in villa development in Amed.
SOLD

Complete August 2025

SOLD

Complete April 2025

SOLD

Complete July 2025

SOLD

Complete August 2025

SOLD

Complete November 2025

SOLD

Complete December 2025

SOLD

Complete March 2026

SOLD

Complete June 2026

SOLD

Complete June 2026

Villas Sold
0%

High Passive Income From Rental Villas

DEVELOPMENT SOLD OUT!

18.2% ROI

$50k Income

75% Occupancy

$250 Daily rate

Build Generational Wealth

Upside opportunity as land and property prices increase

Master plan for Vesica Vilas Celuke in Amed - sold out

3-Bed Luxury Villas In Amed

Development Sold Out! Contact Us for more information

Bali Property Investment Report 2024

This comprehensive Investment Report is a must read for property investors focused on the Bali real estate market.

PDF brochure pages for a Bali real estate investment report.

The 54 page PDF provides a detailed insight into:

Scroll to Top

Please Complete the Form

We will only contact you by your Preferred Method of Contact

Please complete the form

We will contact you only through your preferred method of contact.

Please complete the form

Our Amed based real estate consultant will review your request. We will contact you only through your preferred method of contact.

Download Your Investment Report After Submission

Download Your Information Brochure After Submission